![ABB ACS580MV Скачать руководство пользователя страница 124](http://html.mh-extra.com/html/abb/acs580mv/acs580mv_commissioning-manual_3297124.webp)
124 Option
SBU Hot commissioning
VSD mode test
Close MSS and test VSD mode first according to VSD test steps.
For single motor mode, MSS will close and open same following MCB.
For multi motor mode, motor selection set will close corresponding MSS, and motor
selection unset will open corresponding MSS.
Sync bypass test
•
For single motor mode
Make sure parameter 85.12 is single motor mode.
Test steps:
1. Let drive in remote mode and start monitoring trend.
2. Give MCB close command and start command. Set a reference and wait for drive
reaches the setpoint.
3. Force DI2, drive will go to sync to main mode. After sync is finished. MSS will open
and MB will close.
4. Open MB.
•
For multi motor mode
DANGER
From this step MCB and all of MB, MSS is in normal position and
controlled only by ACS580MV. Medium voltage can be connected to the
converter! Confirm safety area of motor is cleared and auxiliary equipment of
motor is in operation.
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...