Standard Commissioning Process 53
•
Switch on the control power. Update operation starts. Observe the LEDs on PM55X:
a. RUN LED flashing slowly = reading from SD memory card
b. RUN LED flashing fast = programing in progress
c. RUN LED permanent on, ERR LED off = SW download successfully
•
Switch off the control power and remove SD card and the adapter. New SW is
activated after IO controller AC500eco CPU is restarted.
Loading the DSP software manually to power modules
Loading the DSP software automatically to power modules
•
After MCB has been closed and medium voltage introduced to the converter, power
modules boot up.
•
BCON controller checks the SW version on each PM.
•
If the version on PMs is not the same as the SW defined version.
•
BCON will initiate SW downloaded to PMs.
•
Due to safety reason, during SW download MCB will be open (fault 607E “PM
software update in process” is active).
•
The fault cannot be reset until SW download finished (Indicated by message: 607F
“PM SW update done”).
NOTICE
Upgraded software to power modules can be automatic loaded while first close
MCB. Manually loading shall be applied or recommend only if:
•
Automatic loading doesn’t work properly.
•
Always on MV Drives Support line request.
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...