4 - 9
ENG
4. Install:
●
Pilot jet
1
●
Main jet nozzle
2
●
Main jet
3
●
Needle valve seat
4
●
Needle valve seat holder
5
●
Main jet washer
6
5. Install:
●
Needle valve
1
●
Float
2
●
Float pivot pin
3
NOTE:
●
After installing the needle valve to the float,
install them to the carburetor.
●
Check the float for smooth movement.
6. Install:
●
Gasket
●
Float chamber
1
●
Screw (float chamber)
2
7. Install:
●
Spring
1
●
Starter plunger
2
On starter cable
3
.
8. Install:
●
Jet needle set
1
●
Needle holder
2
On throttle valve
3
.
NOTE:
Align the projections
a
on the throttle valve
with the grooves
b
in the needle holder.
CARBURETOR
Summary of Contents for TTR125LM
Page 47: ...GEN INFO MEMO...
Page 63: ...GEN INFO MEMO...
Page 78: ...SPEC 2 11 MAINTENANCE SPECIFICATIONS Cylinder head tightening sequence...
Page 95: ...SPEC 2 11 CARACT RISTIQUES D ENTRETIEN Ordre de serrage de la culasse...
Page 112: ...SPEC 2 11 WARTUNGSDATEN Anzugsreihenfolge Zylinderkopfschrauben...
Page 119: ...SPEC MEMO...
Page 135: ...INSP ADJ MEMO...
Page 461: ...ELEC MEMO...