
TITANUS
MICRO·SENS
®
Pipe
Design
MS_A_04-en-e
Data: 01/09
4 –
13
4.2.3 Sensitivity and pipeline project planning
4.2.3.1 Pipeline
project
planning with pipe accessories
The following project planning tables for pipeline project planning can be
found in the appendix for each previously selected pipe accessory.
z
Project planning without filter
z
Project planning with LF-AD air filter
z
Project planning with LF-AD-1 air filter
z
Project planning with LF-AD-2 air filter
z
Project planning with SF-400 / SF-650 air filter
An area can be monitored with more than detection points than re-
quired by the national guideline in order to improve an air sampling
smoke detection system’s detection quality. In such case, the number
of normatively required sampling points is to be used in calculating the
required sensitivity of an air sampling smoke detection system.
INSTRUCTION
Summary of Contents for TITANUS
Page 1: ...Technical Manual Air sampling smoke detection system TITANUS MICRO SENS ...
Page 2: ......
Page 4: ......
Page 10: ...TITANUS MICRO SENS Contents MS_A_Inhalt en e Data 01 09 ...
Page 14: ...General TITANUS MICRO SENS 0 4 Data 01 09 MS_A_00 en e ...
Page 44: ...Technical Description TITANUS MICRO SENS 2 24 Data 01 09 MS_A_02 b en e ...
Page 65: ...TITANUS MICRO SENS Pipe Design MS_A_04 en e Data 01 09 4 15 ...
Page 124: ...Installation TITANUS MICRO SENS 5 38 Data 01 09 MS_A_05 en e ...
Page 160: ...Commissioning TITANUS MICRO SENS 7 20 Data 01 09 MS_A_07 en e ...
Page 172: ......
Page 178: ......
Page 189: ......
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 196: ......
Page 198: ......
Page 204: ...TITANUS MICRO SENS Glossary TMS_A_Glossar e Data 01 09 ...
Page 206: ......
Page 208: ......