42
Routing the connecting cables and leads
!
Please note
If cables come into contact with hot components
they will be damaged.
When routing and securing cables/leads on site,
ensure that the maximum permissible tempera-
ture for these is not exceeded.
Closing the control unit enclosure
5.
4.
2.
6.
2x
3.
1.
Fig. 41
Insert the programming unit (packed separately) into
the control unit support.
Note
The programming unit can also be inserted into a wall
mounting base (accessories) near the boiler.
Wall mounting base installation instructions
Installation sequence
Electrical connections
(cont.)
5775 636 GB
Installation
Summary of Contents for C3TB
Page 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Page 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Page 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Page 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Page 187: ...187 5775 636 GB ...