6
Heating the DHW loading cylinder from cold ...................................... 164
Operating the fuel cell module ............................................................ 164
Reheating when DHW is drawn off .....................................................164
Boosting DHW heating ....................................................................... 165
Internal H1 extension (standard delivery) .............................................. 165
Internal H2 extension (accessories) ...................................................... 166
External extensions (accessories) ......................................................... 167
External operating program changeover ............................................ 169
External demand ................................................................................ 170
Raising the reduced room temperature .............................................. 173
Reducing the heat-up time ................................................................. 174
Assigning heating circuits to the remote control .................................... 175
Electronic control unit on the peak load boiler ....................................... 176
10. Connection and wiring dia-
Connection diagram, internal (gas condensing module) ....................... 177
Connection diagram, external (gas condensing module) ...................... 178
Differential temperature controller ......................................................... 179
Final decommissioning and disposal ..................................................... 182
Index
Index
(cont.)
5775 636 GB
Summary of Contents for C3TB
Page 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Page 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Page 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Page 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Page 187: ...187 5775 636 GB ...