11
1125
5
40
237
134
2082
2147
2250
20
595
Fig. 4
Fuel cell module to the right of the gas con-
densing module
Preparing for installation
Use a connection set – available as an accessory – to
make the connections on the gas and water sides.
Fitting accessories
Before final siting, attach all of the accessories that are
to be mounted from the back of the boiler (e.g. connec-
tion sets).
!
Please note
Avoid damaging the appliance.
Connect all pipework free of load and torque
stress.
Preparing connections on site:
Connection set installation instructions
Preparing for installation
Siting
(cont.)
5775 636 GB
Installation
Summary of Contents for C3TB
Page 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Page 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Page 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Page 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Page 187: ...187 5775 636 GB ...