15
Arrangement of excess export system when con-
nected into a sub-distribution board
RCD
RCD
K
400 V / 230 V~
L
H
G
F
kWh
Z2
1~
E
A
C
D
B
~
N
M
kWh
Z1
kWh
Z3
Fig. 8
A
Vitovalor 300-P
B
Internal circulation pump
C
Internal consumers
D
GS protection
E
ON/OFF switch
F
Sub-distribution board
G
On-site consumers
H
Meter cupboard
K
Property boundary
L
Low voltage grid
M
Inverter (DC/AC converter) S
EMAX
= 1.5 kVA
N
Fuel cell stack
Z1 Balancing bi-directional meter
Z2 Net electricity meter (standard delivery
Vitovalor 300-P)
Z3 Bi-directional energy management (not relevant for
billing by the grid operator)
Arrangement of excess export when connected
into a main LV distribution board
RCD
RCD
kWh
Z1
H
AC 400 V / 230 V~
K
G
F
kWh
Z2
1~
E
A
C
D
B
kWh
Z3
~
N
M
Fig. 9
A
Vitovalor 300-P
B
Internal circulation pump
C
Internal consumers
D
GS protection
E
ON/OFF switch
F
Meter cupboard
G
On-site consumers
H
Property boundary
K
Low voltage grid
M
Inverter (DC/AC converter) S
EMAX
= 1.5 kVA
N
Fuel cell stack
Z1 Balancing bi-directional meter
Z2 Net electricity meter (standard delivery
Vitovalor 300-P)
Z3 Bi-directional energy management (not relevant for
billing by the grid operator)
Preparing for installation
Notes on connecting to the mains supply
(cont.)
5775 636 GB
Installation
Summary of Contents for C3TB
Page 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Page 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Page 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Page 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Page 187: ...187 5775 636 GB ...