69
"Commissioning/maintenance"
operating mode
must be enabled (
MNT
illuminates).
1.
Select
"80"
using / .
2.
Press
SET
to confirm.
3.
Using / , set the relevant country number (from
the table).
Country
Number to set
DE, CH
0 (delivered condition)
AT
1
FR
2
GB
3
4.
Press
SET
to confirm.
5.
Hold down
SET
until
"END"
and
"nd"
are dis-
played.
6.
Turn ON/OFF switch
B
on the fuel cell module to
"0"
and then back to
"I"
.
7.
Select
"80"
using / and check the setting made.
Commissioning the fuel cell module
Preparing to fill the process circuit with distilled water
!
Please note
Commissioning with
non-distilled water
(e.g.
tap water) will damage the appliance.
Fill only with the distilled water supplied or
available as an accessory
(VDE 0510)
.
A
B
Fig. 68
1.
Undo the screw and remove the cover from distil-
led water filler neck
A
.
2.
Remove the screw and remove funnel
B
.
3.
Attach funnel
B
to distilled water filler neck
A
.
Commissioning, inspection, maintenance
Adjusting country settings for grid monitoring on the fuel cell module
5775 636 GB
Summary of Contents for C3TB
Page 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Page 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Page 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Page 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Page 187: ...187 5775 636 GB ...