171
External demand
Code
Input DE1
3A:2
Input DE2
3b:2
Input DE3
3C:2
The effect on the internal circulation pump is selected
in coding address "3F" in the
"General"
group.
The effect on the relevant heating circuit pump is
selected in coding address "d7" in the
"Heating cir-
cuit"
group.
The set minimum boiler water temperature for external
demand is selected in coding address "9b" in the
"General"
group.
Venting program
During the venting program, the circulation pump will
be alternately switched on and off for 30 s over a
period of 20 min.
The diverter valve alternates between heating and
DHW heating for a given time. The burner is switched
off during the venting program.
Activating the venting program: See "Venting the heat-
ing system".
Fill program
In the delivered condition, the diverter valve is set to its
central position, enabling the system to be filled com-
pletely. After the control unit has been switched on, the
diverter valve no longer goes into its central position.
Afterwards, the diverter valve can be moved into the
central position via the fill function (see "Filling the
heating system"). In this position, the control unit can
be switched off and the system can be filled com-
pletely.
Filling with the control unit switched on
If the system is to be filled with the control unit
switched on, the diverter valve is moved to its central
position in the fill program, and the pump starts.
When the function is enabled, the burner shuts down.
The program automatically becomes inactive after
20 min.
Screed drying
When activating screed drying, observe the informa-
tion provided by the screed manufacturer.
When screed drying is activated, the heating circuit
pump for the heating circuit with mixer starts and the
flow temperature is maintained in accordance with the
selected profile. On completion (30 days), the heating
circuit with mixer is regulated automatically according
to the set parameters.
Note
Temperature profile 6 ends after 21 days.
Observe EN 1264. The report to be provided by the
heating contractor must contain the following details
regarding heat-up:
■
Heat-up data with respective flow temperatures
■
Max. flow temperature achieved
■
Operating state and outside temperature during
handover
Various temperature profiles can be set via coding
address "F1" in the
"Heating circuit"
group.
The function continues after power failure or after the
control unit has been switched off. "Heating and DHW"
is started when screed drying is finished or if code
"F1:0" is set manually.
Function description
Control functions
(cont.)
5775 636 GB
Functions
Summary of Contents for C3TB
Page 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Page 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Page 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Page 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Page 187: ...187 5775 636 GB ...