31
d. Remove the wedge from the feeder as shown below.
Gently lift and hold suction
cup arm with one hand...
1
Then slide wedge out
with other hand
2
Bottom of feeder
Wedge
Front of feeder
Inside of feeder
Gently lower
suction cup arm
3
IMPORTANT:
Save the carton and all packing materials. If you
need to ship the digitizer later, you
must
repack it using the
original wire ties, plastic bags, foam supports and cartons.
Instructions for repacking are provided in “Appendix: Packing
the film digitizer for shipment.”
VIDAR C
AD
P
RO
Advantage Installation Guide
Summary of Contents for CAD PRO Advantage
Page 5: ......
Page 12: ...7 DIAGNOSTICPRO Advantage and DOSIMETRYPRO Advantage Installation Guide ...
Page 30: ...25 CADPRO Advantage Installation Guide VIDAR CADPRO Advantage Installation Guide ...
Page 47: ...42 VIDAR Advantage Series Installation and Operation Guide ...
Page 48: ...43 Interfacing Guide VIDAR Advantage Series Installation and Operation Guide ...
Page 49: ...44 VIDAR Advantage Series Installation and Operation Guide ...
Page 87: ...82 VIDAR Advantage Series Installation and Operation Guide ...
Page 88: ...83 Advantage Series Operating Guide VIDAR Advantage Series Installation and Operation Guide ...
Page 97: ...92 VIDAR Advantage Series Installation and Operation Guide ...
Page 102: ...97 Advantage Series Other Information VIDAR Advantage Series Installation and Operation Guide ...
Page 143: ...138 VIDAR Advantage Series Installation and Operation Guide ...