96
4. Hold the stack in front of you as
you would view it on a light box.
5. Slide the stack into the feeder,
between the guides.
Do not overfill
the feeder:
The 50 sheet feeder can hold up
to 50 sheets at a time.
The 100 sheet feeder can hold up
to 100 sheets at a time.
6. Using your scanning software, execute the
Scan
command.
7. Monitor the exit tray, and remove films periodically to prevent it from
overfilling. The exit tray can hold up to 100 films. If it becomes
overfilled, films may be damaged or jam in the digitizer.
VIDAR Advantage Series Installation and Operation Guide
Summary of Contents for CAD PRO Advantage
Page 5: ......
Page 12: ...7 DIAGNOSTICPRO Advantage and DOSIMETRYPRO Advantage Installation Guide ...
Page 30: ...25 CADPRO Advantage Installation Guide VIDAR CADPRO Advantage Installation Guide ...
Page 47: ...42 VIDAR Advantage Series Installation and Operation Guide ...
Page 48: ...43 Interfacing Guide VIDAR Advantage Series Installation and Operation Guide ...
Page 49: ...44 VIDAR Advantage Series Installation and Operation Guide ...
Page 87: ...82 VIDAR Advantage Series Installation and Operation Guide ...
Page 88: ...83 Advantage Series Operating Guide VIDAR Advantage Series Installation and Operation Guide ...
Page 97: ...92 VIDAR Advantage Series Installation and Operation Guide ...
Page 102: ...97 Advantage Series Other Information VIDAR Advantage Series Installation and Operation Guide ...
Page 143: ...138 VIDAR Advantage Series Installation and Operation Guide ...