![Vermeer 504 PRO Operator And Maintenance Manual Download Page 77](http://html.mh-extra.com/html/vermeer/504-pro/504-pro_operator-and-maintenance-manual_1005437077.webp)
504PRO_604PRO_o-m2_00
-
7-14 Preparing the Equipment Baler
504/604 PRO Baler
•
Install the Monitor mounting system (see Figure 38 on page 7-13) on tractor at a location convenient for the operator.
•
To connect the controller, insert the 9-pin plug into the corresponding socket on the E-LINK PRO tractor harness.
After connecting the plug supply voltage is available.
NOTICE
When baler is not in use, shut-off the power of the E-LINK PRO and disconnect the power supply plug. This prevents
tractor battery discharge.
https://tractormanualz.com
Summary of Contents for 504 PRO
Page 153: ...https tractormanualz com ...