![Vermeer 504 PRO Operator And Maintenance Manual Download Page 65](http://html.mh-extra.com/html/vermeer/504-pro/504-pro_operator-and-maintenance-manual_1005437065.webp)
504PRO_604PRO_o-m2_00
-
7-2 Preparing the Equipment Baler
504/604 PRO Baler
•
To move the tongue jack slowly, you must push the crank handle into the tongue jack up to the stop.
•
Up: Turn the crank handle counter clockwise.
•
Down: Turn the crank handle clockwise.
Figure 25. Tongue jack
KEY:
1. Crank - 2. Tongue jack holder - 3. Safety bolt - 4. Support foot
Install the tongue jack:
1. Make sure the baler is on a level ground, the parking brake is activated and the wheel wedges are blocking the wheels.
2. Remove the safety bolt (3) from the tongue jack holder (2).
3. Manually slide the tongue jack out of the tongue jack holder up to a convenient length.
https://tractormanualz.com
Summary of Contents for 504 PRO
Page 153: ...https tractormanualz com ...