Site Preparation / Installation
03-914642-00:6
2-15
Installation of the 4-port Cross Fitting and the Heated Soil Transfer Line in the
Tekmar 2000 Valve Oven
Refer to Figure 2-10. Remove the trap cover, left side panel, right side panel, top
and the valve oven cover from the Tekmar 2000 as described in the Tekmar 2000
manual.
1. Using a 1/4" open end wrench, remove the three lines attached to the tee
inside the Tekmar 2000 valve oven. Remove the tee. Refer to the Tekmar
2000 plumbing diagram to confirm line locations.
2. Attach to the bottom right port of the new 4-way fitting, the short line attached
to the 6-port valve.
3. Attach the line from the sparge tube (previously removed from the Tekmar
2000 tee) to the upper left port on the new fitting.
4. Insert the Archon heated transfer line into the rear of the 2000, through the
hole labeled “ALS.” Attach the line to the bottom left port on the new fitting.
5. Attach the line from the “Dry Purge” valve (previously removed from the 2000
tee) to the top right port of the new fitting.
6. Check all fittings to ensure they are tight.
Figure 2-10
Installation of the Heated Soil Transfer Line
1. Inside the Archon, use an Allen wrench to loosen the screw securing the
probe and upper soil valve cover. Remove the cover. Remove the insulation
block.
2. Insert the free end of the transfer line into the rear of the Archon, the line will
pass the open slot. Attach the transfer line bracket to the panel with the two
#4 socket head screws already installed in the rear panel.
3. Attach the transfer line to the upper soil valve using a 1/4" open end wrench.
See Figure 2-12.
4. Reinstall the insulation block and the probe cover and screw.
Sparge Tube Line
New 4 Port Tee
Line to Dry
Purge Valve
Line to 6 Port
Valve
LSC 2000 Valve Oven
2000 6 Port
Valve
Transfer Line to
Archon