2. Check that all cables are plugged in.
3. Check that the column from the GC is installed properly, the transfer line is
locked in its operating position and the GC is operating.
4. Plug in the MS power cable into the rear of the instrument.
5. Turn the power switch on the rear panel to its ON position. The foreline pump
should turn on and then stop gurgling after about 10 to 20 seconds. If the
pump continues to gurgle then check that the analyzer assembly is seated on
the manifold properly, (there should be no gaps).
6. Start up the System Control program.
7. Go to the Startup/Shutdown tab dialog in System Control if the program
doesn’t automatically start there.