There are three tubes protruding from the bottom of the manifold. Verify that
these tubes are pointing straight up. If they are bent more than 20 degrees or
damaged, they need to be replaced.
1. Be sure the transfer line is still retracted. The analyzer assembly has four metal
pins that need to align with four holes in the manifold. Align these pins and
slide the analyzer into the manifold. Ensure the wire harnesses and pneumatic
lines between the manifold and bulkhead are not crimped when the analyzer is
Reinstalled.
2. Reconnect the three cables associated with the analyzer: