3.5 Cleaning, disinfection and sterilization
3-19
Disinfection
6. Disinfect the component by means of soaking in disinfection solution. Remove the com-
ponent from the ventilator and dissemble it if it is possible. Use the clean tray for soaking.
Make sure that component is fully soaked into solution, there are no air bubbles. The
soaking time and disinfection method depend on used disinfectant, follow the disinfec-
tant’s manual.
7. Dry component on the air. Do not wipe the component during drying.
a) Automated cleaning and disinfection
For automated cleaning and disinfection use the washing machine comply with ISO 15883.
As cleaning agent use Neodisher FA
®
, as neutralizer - Neodisher Z
®
, both manufactured by
Dr. Weigert. Follow the operation manual of machine and detergent as well. Recommended
regimes are stated in Table 3.3.
Т
able 3.3.
Recommended stages for automated cleaning and disinfection
Stage
Temperature
Duration
Prerinsing
Cold water
3 min
Cleaning
65°C
5 min
Neutralizing
Hot water
1 min
Rinsing
Cold distilled water
3 min
Thermal disinfection
93 °C
44 min
Drying
°C
12 min
Packing
After cleaning and disinfection assemble and put the component into the sterilization pocket.
The sterilization packing should comply with ISO 11607 standard.
Sterilization
•
Sterilize the components in hot steam sterilizer at 134°C and 0.21 MPa. Duration of
sterilization is to be not less than 3 minutes and not more than 14 minutes, unless
other condition indicated in Table 3.4.
Table 3.4. Recommended methods for reprocessing of sterilized components
Component
Procedure
Comment
Expiration valve components
Disconnect the expiration valve housing from the ventilator, see it. 6.6. Clean and disinfect
all components of expiration valve housing (removable part, membrane, water trap) sepa-
rately. After cleaning and disinfection insert the membrane to removable part and assem-
ble the water trap. Sterilize the removable part with membrane and water trap separately.
Assemble the expiration valve housing by connecting the water trap to removable part with
membrane before connection to ventilator. After connection the expiration valve housing to
ventilator perform the calibration, see it. 4.16.3.
Summary of Contents for MV200
Page 2: ......
Page 8: ......
Page 25: ...2 3 Front panel 2 9 2 3 Front panel Figure 2 1 Front view of the electronic unit ...
Page 124: ...4 21 Open valve function 4 76 For your notes ...
Page 158: ...6 11 Check and calibration of mainstream CO2 sensor 6 8 For your notes ...
Page 160: ...7 Troubleshooting 7 2 For your notes ...
Page 162: ...8 Transportation 9 Storage 10 Disposal 10 2 For your notes ...
Page 166: ...13 commission date mark 12 2 For your notes ...
Page 168: ...14 Maintenance and repair data 14 2 For your notes ...
Page 196: ...Appendix 2 9 Ideal body weight of the patient IBW App 2 10 For your notes ...
Page 200: ...Appendix 3 Electromagnetic environment App 3 4 For your notes ...
Page 201: ...Appendix 4 Pneumatic scheme of ventilator App 4 1 APPENDIX 4 PNEUMATIC SCHEME OF VENTILATOR ...
Page 202: ...Appendix 4 Pneumatic scheme of ventilator App 4 2 For your notes ...