CGAD-SVN02C-EN
2
Important Notice
Refrigerant Emission Control
The conservation and reduction of gas
emissions should be reached by following
the operational and service procedures
recommended by Trane, with special
attention to the following:
The refrigerant used in any type of air-
conditioning equipment should be
recuperated and/or recycled to be used
again, captured or completely destroyed
whenever it is removed from the
equipment.
It should never be released
into the atmosphere.
Always consider the possibility of recycling
or reprocessing the refrigerant transferred
before beginning the recuperation by any
method. Questions about recuperated
refrigerants and acceptable qualities are
described in norm ARI 700.
Use approved and safe cylinders. Comply
with all the applicable safety and
transportation norms when transporting
the refrigerant containers.
In order to minimize emissions when
transferring the refrigerant gas, use
recycling equipment. Always use methods
that make the lowest vacuum possible
when recuperating and condensing the
refrigerant inside the cylinder.
Important:
Since Trane do Brasil has continual development of its products as a policy, it reserves the right to
change its specifications and drawings without prior notice. The installation and maintenance of the
equipment specified in this manual should be done by qualified technicians and/or technicians
approved by Trane. The lack of following and/or adopting the procedures presented in this manual
could imply in the product losing its warranty.
IMPORTANT:
Dimensional measuring units on this
catalog are on milimitres (mm). (Exept
for those locally referencied).
Summary of Contents for CGAD020
Page 36: ...CGAD SVN02C EN 36 Wiring Diagram Fig 17 Power and command wiring diagram CGAD 020C Sheet 1 2...
Page 52: ...CGAD SVN02C EN 52 Wiring Diagram Fig 33 Power and command wiring diagram CGAD 070C Sheet 1 2...
Page 60: ...CGAD SVN02C EN 60 Wiring Diagram Fig 41 Power and command wiring diagram CGAD100 Part I...
Page 61: ...CGAD SVN02C EN 61 Wiring Diagram Fig 42 Power and command wiring diagram CGAD100 Part II...
Page 62: ...CGAD SVN02C EN 62 Wiring Diagram Fig 43 Power and command wiring diagram CGAD100 Part III...
Page 63: ...CGAD SVN02C EN 63 Wiring Diagram Fig 44 Layout diagram CGAD100...
Page 64: ...CGAD SVN02C EN 64 Wiring Diagram Fig 45 Power and command wiring diagram CGAD120 Part I...
Page 65: ...CGAD SVN02C EN 65 Wiring Diagram Fig 46 Power and command wiring diagram CGAD120 Part II...
Page 66: ...CGAD SVN02C EN 66 Wiring Diagram Fig 47 Power and command wiring diagram CGAD 120 Part III...
Page 67: ...CGAD SVN02C EN 67 Wiring Diagram Fig 48 Layout diagram CGAD 120...
Page 68: ...CGAD SVN02C EN 68 Wiring Diagram Fig 49 Power and command wiring diagram CGAD150 Part I...
Page 69: ...CGAD SVN02C EN 69 Wiring Diagram Fig 50 Power and command wiring diagram CGAD150 Part II...
Page 70: ...CGAD SVN02C EN 70 Wiring Diagram Fig 51 Power and command wiring diagram CGAD150 Part III...
Page 71: ...CGAD SVN02C EN 71 Fig 52 Layout diagram CGAD150 Wiring Diagram...
Page 72: ...CGAD SVN02C EN 72 Wiring Diagram Fig 53 Layout diagram CGAD 100 125 150 with optionals...