GX9 ASD Installation and Operation Manual
29
Startup and Test
Perform the following checks before turning on the unit:
•
L1/R
,
L2/S
, and
L3/T
are connected to the 3-phase input power.
•
T1/U
,
T2/V
, and
T3/W
are connected to the motor.
• The 3-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secured.
• Front door is closed and all enclosure panels are securely fastened.
• All personnel are clear of the area of the installation and the driven equipment.
Save User Settings
Use the following table to record any changed parameters for future reference.
Table 4. ASD Parameter Changes by Installer/Maintenance Personnel.
ASD ID__________Name:______________________Date:_______
Notes
Parameter
Number
Parameter Name
Default or
Previous
Setting
New Setting
Unit of
Measure
Note:
Settings may also be recorded via Program
Utilities
Type Reset
Summary of Contents for GX9
Page 2: ......
Page 3: ...Document Number 66893 001 March 2014 GX9 ASD Installation Operation Manual ...
Page 4: ......
Page 12: ...iv GX9 ASD Installation and Operation Manual ...
Page 251: ...GX9 ASD Installation and Operation Manual 239 Figure 36 GX9 ASD 5 0 20 HP Enclosure ...
Page 252: ...240 GX9 ASD Installation and Operation Manual Figure 37 GX9 ASD 25 75 HP Enclosure ...
Page 253: ...GX9 ASD Installation and Operation Manual 241 Figure 38 GX9 ASD 100 200 HP Enclosure ...
Page 254: ...242 GX9 ASD Installation and Operation Manual Figure 39 GX9 ASD 250 400 HP Enclosure ...
Page 255: ...GX9 ASD Installation and Operation Manual 243 Figure 40 GX9 ASD 500 800 HP Enclosure ...
Page 256: ...244 GX9 ASD Installation and Operation Manual Figure 41 GX9 ASD 900 1200 HP Enclosure ...
Page 268: ......
Page 269: ......