31. Put two alignment pins into the metering ring
(Fig. 94).
Figure 94
32. Stack the isolation manifold (4 plates bonded to-
gether) onto the metering ring, aligning the grooves on
the side of the manifold with the grooves on the side of
the upper cover plate (Fig. 95). Align the alignment pin
holes with the alignment pins in the metering ring. The
isolation manifold surface without the recessed slots
must be toward the metering ring.
Figure 95
33. Install two alignment pins into the isolation manifold
(Fig. 96).
Figure 96
®
Repairs
Page 8 - 46
Groundsmaster
300 Series
Summary of Contents for Groundsmaster 328-D
Page 2: ......
Page 12: ...Torque Specifications Page 2 4 Rev A Groundsmaster 300 Series ...
Page 44: ...Troubleshooting Page 4 16 Groundsmaster 300 Series ...
Page 45: ...Groundsmaster 300 Series Page 4 17 Troubleshooting ...
Page 171: ...Groundsmaster 300 Series Page 6 25 Testing ...
Page 220: ...Repairs Page 7 24 Groundsmaster 300 Series ...
Page 320: ...Troubleshooting Troubleshooting Page 11 4 Groundsmaster 300 Series ...
Page 348: ...Troubleshooting Troubleshooting Page 12 4 Groundsmaster 300 Series ...
Page 379: ...Troubleshooting Groundsmaster 300 Series Page 13 3 Troubleshooting ...
Page 400: ...This page is blank ...
Page 401: ...This page is blank ...