Equipment Setup: Machine Components
P/N 7010-0781
5-13
3DMC Setup
Once the hardware components are set up, installed, and connected,
apply 3DMC machine and job files. Chapter 2 describes in more
detail the items in the following checklist.
Select the correct Machine Configuration file.
Topcon Logo
Control
Machine setup
Select the Control Point file.
Topcon Logo
File
Control
Select the Working and/or Reference Surface files.
Topcon Logo
File
Surfaces
Working
Topcon Logo
File
Surfaces
Reference
As needed, select the Alignment file.
Topcon Logo
File
Alignment
As needed, select the Linework file.
Topcon Logo
File
Linework
Select the Points file.
Topcon Logo
File
Points
After selecting the information to view on the Main Screen, begin
paving. See Chapter 3 for details on the different data and screen
views available.
Summary of Contents for mmGPS 3D Paver
Page 1: ...MM 03 0AVER 2EFERENCE ANUAL...
Page 2: ......
Page 4: ...ECO 3067...
Page 34: ...Introduction mmGPS 3D Paver Reference Manual Notes 1 20...
Page 70: ...Setting up the Jobsite and Pocket 3D mmGPS 3D Paver Reference Manual Notes 2 36...
Page 208: ...Getting Started mmGPS 3D Paver Reference Manual Notes 5 32...
Page 252: ...Safety Information mmGPS 3D Paver Reference Manual Notes A 4...
Page 278: ...Glossary mmGPS 3D Paver Reference Manual Notes E 6...
Page 285: ...Index P N 7010 0781 Index definition 3 23 display options 3 25...
Page 286: ...mmGPS Paver 3D Reference Manual Notes Index...
Page 287: ......