Using Sonic Control at the Jobsite
P/N 7010-0781
6-5
ground on the next pass—consider the Tracker position so it
works for both applications without having to move the Tracker.
Figure 6-4. Position L-Bar and Tracker Over Grade Reference
Step 2: Set up 9168 Control Box
After attaching the control box to the machine and connecting cable,
configure 3DMC for paving with the Sonic Tracker.
In 2D control applications, only the machine configuration file is
relevant. Other files, settings, and selections have no affect in this
mode. The machine configuration file provides vital information
about the type of machine selected All other sensor settings and
measurements are ignored. You must have a machine configuration
file before beginning to pave.
1. Use the hand knob to attach the control box to the machine
2. Connect the various electrical cables (Figure 6-5 on
page 6-6). Cable connections differ depending on the machine
type.
T
CURB
Son
ic Tr
acke
r II
Son
ic T
racker
II
Summary of Contents for mmGPS 3D Paver
Page 1: ...MM 03 0AVER 2EFERENCE ANUAL...
Page 2: ......
Page 4: ...ECO 3067...
Page 34: ...Introduction mmGPS 3D Paver Reference Manual Notes 1 20...
Page 70: ...Setting up the Jobsite and Pocket 3D mmGPS 3D Paver Reference Manual Notes 2 36...
Page 208: ...Getting Started mmGPS 3D Paver Reference Manual Notes 5 32...
Page 252: ...Safety Information mmGPS 3D Paver Reference Manual Notes A 4...
Page 278: ...Glossary mmGPS 3D Paver Reference Manual Notes E 6...
Page 285: ...Index P N 7010 0781 Index definition 3 23 display options 3 25...
Page 286: ...mmGPS Paver 3D Reference Manual Notes Index...
Page 287: ......