Thermo Fisher Scientific
SOLA II User Guide 4-1
Chapter 4
Startup & Shutdown
Perform this procedure when starting up a new installation or when major
service work is performed. Otherwise, perform the procedure according to the
section titled
“Startup after Short-Term Shutdown.”
See the application data that shipped with the instrument, the
in Chapter 2, and the installation instructions in
information necessary in performing the following procedure.
1.
Verify proper electrical power and connections:
a.
Ensure the instrument electrical power wiring is properly sized and
connected.
b.
Ensure the power voltage and frequency matches the instrument
requirements.
c.
Ensure a suitable circuit breaker and power switch is installed.
d.
Ensure the instrument is properly grounded.
e.
Inspect all electrical connections. Terminals must be snug; wire and
cable plugs must be fully seated. Perform a visual check for electrical
shorts.
f.
Inspect the plug-in cards; ensure they are properly seated in their
connectors.
g.
Ensure the signal wiring is properly sized and connected.
2.
Verify proper plumbing:
a.
Ensure the correct supply tubing is properly connected to the
instrument.
b.
All sample lines to the analyzer MUST be cleaned and dried before
initial use.
c.
Check all tubing connections to ensure they are tight and free of
leaks. Pressure test the lines to check for leaks or use a liquid leak
detector.
Initial Startup
Summary of Contents for SOLA II
Page 2: ...SOLA II Sulfur Online Analyzer User Guide P N 90 1307 0 Revision AB...
Page 4: ......
Page 6: ......
Page 12: ......
Page 16: ......
Page 38: ......
Page 50: ......
Page 84: ......
Page 92: ......
Page 150: ......
Page 160: ......
Page 168: ......
Page 188: ......
Page 194: ......
Page 198: ......
Page 200: ...Thermo Fisher Scientific SOLA II User Guide M 2 THIS PAGE INTENTIONALLY BLANK...