4 • System Plumbing
Doc. 065447-02 12/14
73
4.1.2
System Plumbing Checklists
The system plumbing steps and the order in which they are performed vary
slightly, depending on the installed detector. The following checklists outline
the steps for each detection type.
Capillary
IC
CD System Plumbing Checklist for Capillary IC
Page
Install and flush the trap column (KOH-based
separations only)
Connect the pump outlet
Fill and flush the regenerant path
Check the background conductivity
Complete the IQ and system function test
Complete the OQ (optional)
Flush and condition the electrolytic devices
Flush and install the columns
Complete the plumbing
Connect waste lines to the gas separator waste tube
Equilibrate the system
ED System Plumbing Checklist for Capillary IC
Page
Install the ED amperometry cell
Connect the pump outlet
Fill and flush the liquid path
Flush and condition the electrolytic devices
Complete the IQ and system function test
Complete the OQ (optional)
Flush and install the columns
Complete the plumbing
Connect waste lines to the gas separator waste tube
Equilibrate the system