Dionex ICS-5000
+
Installation Instructions
iv
Doc. 065447-02 12/14
Filling and Flushing the ED Liquid Path . . . . . . . . . . . . . . . .78
4.1.10 Flushing and Conditioning the Electrolytic Devices . . . . . . .79
4.1.11 Flushing and Installing the Columns . . . . . . . . . . . . . . . . . . .84
4.1.12 Completing the Plumbing for Conductivity Detection . . . . .90
4.1.13 Completing the Plumbing for Electrochemical Detection . . .92
4.1.14 Routing the IC Cube Tubing . . . . . . . . . . . . . . . . . . . . . . . . .93
Plumbing an Analytical IC System . . . . . . . . . . . . . . . . . . . . . . . . . .95
Tubing and Fittings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .95
System Plumbing Checklists . . . . . . . . . . . . . . . . . . . . . . . . .96
Plumbing the Static Mixer or Trap Column . . . . . . . . . . . . .96
Completing the IQ Checklist . . . . . . . . . . . . . . . . . . . . . . . . .98
Performing the System Function Test . . . . . . . . . . . . . . . . . .99
Completing the Operational Qualification . . . . . . . . . . . . . .99
Plumbing the EG for Analytical IC Applications . . . . . . . . .99
Plumbing the DC for Analytical IC Applications . . . . . . . .110
Plumbing the TC for Analytical IC Applications . . . . . . . .114
Connecting Waste Lines to the Gas Separator Waste Tube . . . . . . .116
Equilibrating the System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .118
Installing a Backpressure Coil . . . . . . . . . . . . . . . . . . . . . . .120
Pressurizing Eluent Reservoirs . . . . . . . . . . . . . . . . . . . . . . . . . . . . .121
Installing the TC/VWD/PDA Regulator Bracket . . . . . . . .122
Connecting the Gas Source . . . . . . . . . . . . . . . . . . . . . . . . .122