B • Installing DC Options
Doc. 065447-02 12/14
137
5. Verify that the reference electrode O-ring has
been removed and the reference electrode
gasket is correctly installed in the bottom of the
well.
6. Screw the pH-Ag/AgCl reference electrode into
the reference electrode well and tighten it
fingertight (see
Figure B-12. Installing the pH-Ag/AgCl Reference
Electrode In the Reference Electrode Well
7. Refer to
to complete the cell plumbing.
Installing the pH-Ag/AgCl Reference Electrode in the Cell for Analytical
IC Systems
1. To avoid any hydraulic pressure buildup when inserting the reference
electrode into the cell, make sure that fitting plugs are not installed on the
cell inlet and outlet fittings.
2. Verify that the pH-Ag/AgCl reference electrode O-ring is present (see
) and then screw the pH-Ag/AgCl reference electrode into the
reference electrode well and tighten it fingertight (see
Figure B-13. pH-Ag/AgCl Reference Electrode O-Ring
Reference
Electrode
O-Ring (Must
be present for
analytical IC)