User Manual of SY5000 series AC Drive Operation panel and extension cable
~112~
1.2 Installation instruction
1.2.1 Instruction of operation panel
Figure 1-3 Instruction of operation panel
NOTE:
1. Put operation panel into the groove of external control panel, as shown in the figure,
and then slightly push down.
2. Confirm the entering of operation panel.
2 Optional accessories
2.1 extension cable
Operation panel can connect with inverter host by extension cable (as shown
in Figure 2-2). Length of cable: 1m, 2m, 3m, 5m. If users need extension cable
longer than 5m, please contact the factory when place the order. The shape of
extension cable is as shown in Figure 2-1.