ENGINE MECHANICAL (RHZ ENGINE)
6A3-19
3. Starting motor
27) Check the following special tools installing procedures.
If special tool(s) can not install, perform step 1) to step 25)
again after removing timing belt.
NOTE:
Camshaft and crankshaft have to be pegged by special
tools when removing crankshaft pulley.
Otherwise, timing belt setting has to be reset.
a) Camshaft timing belt pulley (1) is locked inserting special
tool (A) into cylinder head hole as shown in figure.
Special tool
(A): 09910-26540 / OUT0000151
b) Flywheel (MT) or drive plate (AT) is locked inserting special
tool (B) into holes in both cylinder block and flywheel (MT)
(or drive plate (AT)).
Special tool
(B): 09910-26530 / OUT0000160
28) Install upper timing belt covers.
29) Install fuel filter assembly and connect fuel hoses securely.
30) Install bracket (1).
31) Install radiator referring to “RADIATOR” in Section 6B.
32) Refill cooling system referring to Section 6B.
33) Install generator belt referring to “GENERATOR BELT” in Sec-
tion 6H.
34) Connect negative cable to battery.
35) Check to make sure that there is no coolant leakage or fuel
leakage at hose connection.