INSPECTION
CHARGING OUTPUT CHECK
Start the engine and keep it running at 5 000r/min.
Using the pocket tester, measure the DC voltage
between the battery terminal
and
.
If the tester reads under 13.5V or over 16.0V,
check the AC generator no-load performance and
regulator/rectifier.
NOTE:
When making this test, be sure that the
battery is full-charged condition.
STD charging output
13.5V 16.0V at 5 000r/min
-
Pocket tester
09900-25002
AC GENERATOR NO-LOAD PERFORMANCE
Disconnect the three lead wires from the AC
generator terminal.
Start the engine and keep it running at 5 000r/min.
Using the pocket tester, measure the AC voltage
between the three lead wires.
If the tester reads under 70V, the AC generator is
faulty.
STD No-load performance
More than 70V (AC) at 5 000r/min
6-7
ELECTRICAL SYSTEM
DCV
Regulator
Rectifier
IG. switch
Battery
Summary of Contents for EN125-2A
Page 1: ...SERVICE MANUAL 99500H06100 01E EN125 2A...
Page 5: ......
Page 31: ...PERIODIC MAINTENANCE AND TUNE UP PROCEDURES 2 18 7 6 6 8 9 B B A...
Page 88: ...FUEL AND LUBRICATION SYSTEM CONTENTS 4 1 4 2 4 6 4 FUEL COCK CARBURETOR LUBRICATION SYSTEM...
Page 95: ...4 7 FUEL AND LUBRICATION SYSTEM...
Page 161: ...7 9 SERVICING INFORMATION 10 13 11 14 12 15 16 21 18 22 19 17 23 20 24...
Page 162: ...SERVICING INFORMATION 7 10 27 25 28 26 29 30 37 33 31 38 34 35 32 39 36...
Page 163: ...7 11 SERVICING INFORMATION 40 43 41 44 45 46 49 47 48 42...
Page 176: ...EN125HU SUPPLEMENTARY SERVICE MANUAL...
Page 181: ......
Page 203: ......