Chapter 5
Finishing Up
5-5
2. Ensure that the bezel is properly closed.
See
Section 5.2, “Closing the Bezel” on page 5-3
.
3. Lift the server to its position on the rack and begin to slide it in.
See
FIGURE 5-6
.
FIGURE 5-6
Beginning to Slide the Server In
4. Continue to slide the server back into the rack.
5. When fully seated, secure the server in place by tightening the screws at both
sides of the bezel.
See
FIGURE 5-7
.
FIGURE 5-7
Securing the Server
6. Reconnect the following cables to the rear panel of the server:
■
Network cables
■
ALOM cables
■
Serial cables
■
USB cables
■
PCI connector cables
■
SCSI cables
Summary of Contents for Netra 210
Page 12: ...xii Netra 210 Server Service Manual March 2006...
Page 28: ...1 12 Netra 210 Server Service Manual March 2006...
Page 72: ...3 32 Netra 210 Server Service Manual March 2006...
Page 104: ...5 8 Netra 210 Server Service Manual March 2006...
Page 108: ...A 4 Netra 210 Server Service Manual March 2006...
Page 118: ...B 10 Netra 210 Server Service Manual March 2006...
Page 122: ...Index 4 Netra 210 Server Service Manual March 2006...