5-4
Netra 210 Server Service Manual • March 2006
3. Gently lift the grips up and push them toward the chassis at the same time.
See
FIGURE 5-5
.
FIGURE 5-5
Closing the Bezel
The bezel folds upward.
Note –
If the bezel catches while folding, stop. Gently lower the side of the bezel
that is higher to be parallel with the opposite side. Then try to fold the bezel again.
4. Determine your next steps:
■
If the server is powered off, power it on. See
Section 5.4, “Powering On the
Server” on page 5-6
.
■
Otherwise, return to that procedure that directed you here.
5.3
Installing the Server Into the Rack
The following instructions are for replacing the server into a generic rack and might
include steps that are not necessary to install the server into your rack.
Note –
If you are installing the server into the rack for the first time, see the Netra
210 Server Setting Up Guide, 817-2752.
1. Ensure that the top cover is securely in place.
See
Section 5.1, “Installing the Top Cover” on page 5-1
.
Summary of Contents for Netra 210
Page 12: ...xii Netra 210 Server Service Manual March 2006...
Page 28: ...1 12 Netra 210 Server Service Manual March 2006...
Page 72: ...3 32 Netra 210 Server Service Manual March 2006...
Page 104: ...5 8 Netra 210 Server Service Manual March 2006...
Page 108: ...A 4 Netra 210 Server Service Manual March 2006...
Page 118: ...B 10 Netra 210 Server Service Manual March 2006...
Page 122: ...Index 4 Netra 210 Server Service Manual March 2006...