Appendix C - Installation Checklist
Install and Configure the Spectra BlackPearl system
Date Completed
Install HBAs in the system. See
& 36-Drive Chassis HBA Installation
Rack mount the system and 44-bay expansion nodes.
See the
BlackPearl Rack Mounting Guide
for instructions.
WARNING:
96-bay and 107-bay expansion nodes are always
installed by Spectra Logic Professional Services.
Install drives. See the
BlackPearl Drive Installation Guide
.
Connect Ethernet Cables on page 47
.
Power On the System on page 47
.
Configure the BlackPearl Management Port on page 50
Automatically Import Activation Keys on page 51
.
Log Into the BlackPearl User Interface on page 52
.
Configure the Data Connection on page 55
Configure SMTP Settings on page 179
Manually Starting the S3 Data Path Backend on page 299
.
Configure NAS Services on page 233
Create a Storage Pool on page 101
.
Create a Disk Partition on page 107
.
Select a data policy. See
Understanding Spectra Advanced
Bucket Management Concepts on page 66
.
Set the default data policy for the administrator. See
.
View S3 Credentials on page 64
Configure Mail Recipients on page 336
.
Continue to the next page.
November 2020
User Guide-BlackPearl Converged Storage System
- 413 -