SVP08-0/1/2/3 - Code: 3529.0231.01
Rev. F
dated 02/07/2015
Arc. 66-VII
PT
0715
MV
0715
MC
0715
Service
Phone (+39) 0445.595.111
51
13) secure the cap on the opposite side;
14) push the support plate so that the end locks onto the necks of the roller;
15) secure the sheet to the shoulders of the machine using the relative screws,
adjusting their height as necessary;
16) refit the plastic guard;
17) tension the conveyor belt as described in par.
7.4.4
on page 53.
7.4.1.5 Replacement of the main piston (ref. 1 Fig. 13 on page 51)
To replace the main piston proceed as follows :
- remove the upper covers “fixed joint“ placed and connected to as many safety
micro-switches;
- remove the screws (
ref. 7 Fig. 13
);
- turn the hopper and let it lay due to its weight as showed in
Fig. 13
;
- take the knife out (
ref. 2 Fig. 13
);
- take the piston out (
ref. 1 Fig. 13
);
- replace the piston (
ref. 1 Fig. 13
) with the new one;
- Re-insert the piston (
ref. 1 Fig. 13
);
- insert the knife (
ref. 2
Fig. 13
), paying attention to the lever (
ref. 9
Fig. 13
) which
should be inserted on the support knife (
ref. 8
Fig. 13
);
- put the hopper back and fix by screws (
ref. 7 Fig. 13
).
Fig. 13 Clean
1
2
3
4
5
6
7
8
9
Summary of Contents for SVP08-0
Page 2: ......