Handling and installation area
3.1
Shipping, handling and positioning
3.1.1
Precautions on receipt of the product
The machine is supplied by the manufacturer ex-works. Before delivery to the
shipping agent, the consignment is carefully inspected by the Manufacturer.
The Manufacturer is not liable for damage or removal of parts incurred after delivery
to the shipping agent.
On reception of the consignment, the Customer must:
3.1.2
Handling
Remark
The machine’s component parts are usually provided with packaging;
unpackaged parts must be shipped under cover.
All component parts which may shift during shipping must be secured.
Remark
Check that the consignment corresponds to the specification of supply.
Check that the machine has not suffered damage during shipping and that
the packaging has not been tampered with and parts removed. If the
consignment has been damage or parts are missing, immediately notify
the shipping agent and Manufacturer; document all such damage
photographically.
Warning!
Before handling the machine, check that the area is adequately illuminated
and the floor is clear of obstacles, flat and even (no holes or depressions).
Danger
To lift the machine, use two ropes of minimum length 1.20 metres.
Before lifting the machine, make sure that the ropes and lifting equipment
are rated for the load in question, as well as being suited for the
arrangement of the ropes themselves. In any case, the lifting apparatus
must conform to current laws and regulations. For information on the
weight of the machine, refer to Table 2 on page.