11 Commissioning
11.1 Switching the storage system on
The storage system can only be switched on if the public network voltage has
been switched on first.
1.
Switch on the grid voltage using the miniature circuit breaker for the mains line.
2. Remove the switch cover on the inspection window of the switch panel.
3. Press the ON/OFF switch so it clicks into the
ON (I)
position.
4. Reattach the switch cover to the inspection window.
The storage system then starts and runs a self-test. Once the self-test is successful, the
storage system is ready to operate.
When the storage system is in normal operation, the sonnen Eclipse pulses white. The other
operating statuses and the associated indications of the sonnen Eclipse are described in
section Troubleshooting [P. 84].
11.2 Carrying out first-time commissioning
First-time commissioning must be carried out when the storage system has been installed,
set up and connected for the first time.
11.2.1 Commissioning assistant
The storage system is only ready for operation if the commissioning assistant is
fully completed.
Conditions:
ü
Storage system installation is complete.
ü
The storage system is switched on (see Switching the storage system on [P. 79]).
The commissioning assistant is used to set up the storage system, whereby the follow-
ing data is recorded and settings configured:
• Check the installed software version and update if necessary.
• Record the operator’s customer information.