8 | Using digital inputs/outputs (optional)
62 / 100
Installation instructions sonnenBatterie 10
K3
Illustration 26: Example: CHP unit without op-
erating contact
1
Combined heat and power station
K3
Relay
Combined heat and power station without
operating contact
If the combined heat and power station (1) does not
have a potential-free operating contact, it can be
connected as shown in the figure. In this set-up, a
relay is used to detect whether the generator is
active. This information is forwarded to the storage
system via a potential-free make contact in the re-
lay.
8.2.5 Recording fluctuating power of an electrical generator
• The power of an electrical generator that does not produce constant output cannot be
(see Recording constant power of an electrical generator
Instead, the electrical generator has to be integrated in the power measurement via a
separate measurement point. To achieve this, an additional power meter may be neces-
sary. The additional measurement point must be set in the commissioning assistant ac-
cordingly.
Further information on power measurement and the power meter can be
found in the power meter instructions
8
. These instructions explain, among
other things, the different measurement concepts and how to use multiple
power meters.
8
document number: 401, item number: 22118