
6 | Connecting the storage system
34 / 100
Installation instructions sonnenBatterie 10
Installation with single-phase building mains
17
16
14
15
kWh 3~
3
L1
18
4
2
3
1
3
6
5
1
10
9
8
T
L
N PE
12
13
L1 L2 L3 N PE
L1 L2 L3 N PE
2
1
L
N
13
Illustration 6: Circuit diagram overview – electrical connection in single-phase mains
1
Consumers in building
10
Power meter WM271
2
for consumption - L1
11
Bidirectional counter
3
for consumption - L2 (not connected)
12
Public electrical mains
4
for consumption - L3 (not connected)
13
for PV inverter
5
3
)
14
6
B20/B25
15
for production - L2 (not connected)
7
Transformer interface for consumption (A2)
16
for production - L3 (not connected)
8 Storage system
17
9
4
18
Transformer interface for production (A1)
3
Rated differential current of 300 mA, 100 mA or 30 mA. Type depending on the local conditions. Country-specific requirements must be ob-
served.
4
Protection of the line must be ensured.
Summary of Contents for sonnenBatterie 10
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried ...