
3595 4C User Manual Part Two IMP Commands
35952350 (CH01/AA)
1-53
1.4 SUGGESTED COMMAND PROCEDURES
Before an IMP can take a measurement, it must first be assigned a task and enabled (set-up). Only then
can an IMP be instructed to take a measurement. Each result must then be read, otherwise buffer space
will be filled until the IMP no longer has room to store new data and measurements will stop.
The command language used by the IMP is very versatile, allowing great flexibility in the way each channel
can be configured and used. To assist in preparing a software application, suggested command
procedures are outlined overleaf. The detailed function and syntax of each command is documented in the
Command Directory (page 1-8 onwards). Once familiar with commands, procedures can be tailored to suit
a particular requirement.
Summary of Contents for 3595 4C
Page 1: ...Precision measurement solutions 3595 4C PC to S Net Interface USER MANUAL 35952350...
Page 2: ...ii 35952350 2001 SOLARTRON MOBREY LIMITED...
Page 6: ...vi 35952350...
Page 7: ......
Page 8: ......
Page 10: ...1 ii 35952350...
Page 12: ...1 iv 35952350...
Page 48: ...Programming the 3595 4C Interface card 3595 4C User Manual Part One 3 20 35952350 CH03 AA...
Page 49: ...3595 4C PC to S Net Interface User Manual PART TWO IMP Commands and Responses...
Page 50: ...2 ii 35952350...
Page 52: ...2 iv 35952350...
Page 108: ...IMP Commands 3595 4C User Manual Part Two 1 56 35952350 CH01 AA...
Page 110: ...Results and Error Formats 3595 4C User Manual Part Two 2 2 35952350 CH02 AA...
Page 122: ...Database Structure 3595 1H and 1J IMP 3595 4C User Manual Part Two A 2 35952350 APPX A AA...
Page 126: ...Database Structure 3595 1H and 1J IMP 3595 4C User Manual Part Two A 6 35952350 APPX A AA...
Page 127: ......