
73
15.COORDINATE MEASUREMENT
By performing coordinate measurements it is possible to find the 3-dimensional coordinates of the
target based on station point coordinates, instrument height, target height, and azimuth angles of the
backsight station which are entered in advance.
• It is possible to allocate softkeys in measurement menus to suit various applications and the ways
that different operators handle the instrument.
"21.6 Allocating Key Functions"
Before performing coordinate measurement, enter instrument station coordinates, instrument height
and target height.
PROCEDURE
1. First measure the target height and instrument
height with a tape measure, etc.
2. Select "Coord." in <Menu>.
15.1
Entering Instrument Station Data
Summary of Contents for SRX1
Page 2: ...Li ion S Li ion This is the mark of the Japan Surveying Instruments Manufacturers Association ...
Page 175: ...167 29 REGULATIONS CE Conformity Declaration ...
Page 176: ...29 REGULATIONS 168 ...
Page 177: ...169 29 REGULATIONS ...
Page 182: ...MEMO ...
Page 183: ...JAPAN ...
Page 184: ...1st ed 01 0609 Printed in Japan 2006 SOKKIA CO LTD ...