
99
17. SETTING-OUT MEASUREMENT
5. Position the target on the line of sight and press
[DIST]
to begin distance measurement.
The distance and direction to move the target until
the setting out point is located is displayed on the
SRX. The sighting point measurement results
(currently installed position of the target) are
displayed.
6. Sight the target and press
[DIST]
. Measurement
begins and the measurement results are
displayed.
7. Press
[REM]
in the second page to start REM
measurement.
The distance (height difference) and direction to
move the target until the sighting point and setting
out point are located is displayed on the SRX. The
sighting point measurement results are displayed.
Press
[STOP]
to stop measuring.
Find the setting-out point by moving the telescope
until the distance to the setting-out point reads 0m.
• Movement indicator (Red indicates that target
position is correct)
:
: Move the telescope near the zenith
: Move the telescope near the nadir
: Telescope direction is correct
For details of other movement indicators:
"17.2 Distance Setting-out Measurement"
step 5
Arrows indicate direction to move
Summary of Contents for SRX1
Page 2: ...Li ion S Li ion This is the mark of the Japan Surveying Instruments Manufacturers Association ...
Page 175: ...167 29 REGULATIONS CE Conformity Declaration ...
Page 176: ...29 REGULATIONS 168 ...
Page 177: ...169 29 REGULATIONS ...
Page 182: ...MEMO ...
Page 183: ...JAPAN ...
Page 184: ...1st ed 01 0609 Printed in Japan 2006 SOKKIA CO LTD ...