
95
17. SETTING-OUT MEASUREMENT
After setting the coordinates for the point to be set out, the SRX calculates the setting-out horizontal
angle and horizontal distance. By selecting the horizontal angle and then the horizontal distance
setting-out functions, the required coordinate location can be set out.
• Previously recorded setting-out points can be placed in order. Up to 30 points can be recorded.
• To find the Z coordinate, attach the target to a pole etc. with the same target height.
PROCEDURE
1. Select "Setting out" in <Menu> to display <Setting
out>.
2. Select "Station setup" to display <Height setting>.
If necessary, enter data for Backsight setup.
"17.2 Distance Setting-out Measurement"
steps 2 to 3
17.3
Coordinates Setting-out Measurement
Summary of Contents for SRX1
Page 2: ...Li ion S Li ion This is the mark of the Japan Surveying Instruments Manufacturers Association ...
Page 175: ...167 29 REGULATIONS CE Conformity Declaration ...
Page 176: ...29 REGULATIONS 168 ...
Page 177: ...169 29 REGULATIONS ...
Page 182: ...MEMO ...
Page 183: ...JAPAN ...
Page 184: ...1st ed 01 0609 Printed in Japan 2006 SOKKIA CO LTD ...