MV-805 IP Multiviewer User Manual
Connect up Network and Power onto the Unit
Getting Started 1 - Unit Settings (RollCall Template) 7.4
Issue1 Revision 1
Page 88
© 2018 SAM
7.4 Connect up Network and Power onto the Unit
With the MV-805 unit shutdown, connect it to the final control and IP fabric networks:
4.
Connect the MV-805 unit to the main control network(s) and the IP media network(s)
(Fabrics A and B). See Figure 63.
5.
Press the front
Power
push button (see Figure 64) for 3 to 5 seconds.
Wait for the MV-805 unit to power up. This takes 2 to 3 minutes.
6.
Once the MV-805 unit has started up:
•
The front ‘System Operating’ LED is on.
•
The front ‘LAN 2’ LED should show activity (on the “Control” interface).
The MV-805 unit is available for discovery by SAM Orbit in a SAM IP Routing system.
Figure 63 Network Interface Connections for a MV-805 Turnkey Unit
Note: “
Control 2” may be connected
to the same network as “Control”.
Note:
Must connect to different networks.
Figure 64 Power Push Button
Power Push Button
System Operating LED
LAN 2 LED