![SMC Networks LECSB Series Operation Manual Download Page 268](http://html1.mh-extra.com/html/smc-networks/lecsb-series/lecsb-series_operation-manual_1299641268.webp)
12 - 2
12. OPTIONS AND AUXILIARY EQUIPMENT
12. OPTIONS AND AUXILIARY EQUIPMENT
WARNING
Before connecting any option or peripheral equipment, turn off the power and wait
for 15 minutes or longer until the charge lamp turns off. Then, confirm that the
voltage between P(
) and N(
) is safe with a voltage tester and others.
Otherwise, an electric shock may occur. In addition, always confirm from the front
of the driver whether the charge lamp is off or not.
CAUTION
Use the specified auxiliary equipment and options. Unspecified ones may lead to a
fault or fire.
12.1 Cable/connector sets
POINT
The IP rating indicated is the cable's or connector's protection against ingress of
dust and water when the cable or connector is connected to a driver or servo
motor. If the IP rating of the cable, connector, driver and servo motor vary, the
overall IP rating depends on the lowest IP rating of all components.
As the cables and connectors used with this servo, purchase the options indicated in this section.