![SMC Networks LECSB Series Operation Manual Download Page 257](http://html1.mh-extra.com/html/smc-networks/lecsb-series/lecsb-series_operation-manual_1299641257.webp)
10 - 3
10. OUTLINE DRAWINGS
(2) LECSB
□
-S8
[Unit: mm]
170
6
A
p
pr
ox
.1
4
Approx.
25.5
5
Approx.68
With MR-J3BAT
CN5
CN6
CN3
CN1
CN2
CN2
L
CN4
L1
L2
L3
N
P1
P2
P C
D
L11
L2
1
U
V
W
CHARGE
CNP1
L1
L2
L3
N
P1
P2
P
C
D
L11
L21
U
V
W
CNP2
CNP3
1
56
6
6
1
61
1
68
6
6
mounting hole
Approx.80
(Note)
(Note)
Note. This data applies to the 3-phase or 1-phase 200 to 230VAC and 1-phase 230VAC power supply models.
For 1-phase, 100 to 120VAC power supply, refer to the terminal signal layout.
Mass: 1.0 [kg] (2.21 [lb])
L
1
L
2
L
3
N
P
1
P
2
P
C
D
L
11
L
21
U
V
W
CNP3
CNP2
CNP1
PE terminal
Screw size: M4
Tightening torque: 1.2 [N m] (10.6 [lb in])
Terminal signal layout
P
C
D
L
11
L
21
U
V
W
CNP3
CNP2
For 3-phase
200 to 230VAC and
1-phase 230VAC
L
1
L
2
N
P
1
P
2
CNP1
For 1-phase
100 to 120VAC
Mounting screw
Screw size: M5
Tightening torque: 3.24[N m] (28.7[lb in])
Mounting hole process drawing
2-M5 screw
6
Approx.
40
With LEC-MR-J3BAT