20/11/2020
73/88
E_MH_Installation_instructions_Skylux_Climax
Tie bar for saddle roof
ASSEMBLY
Measure the length of the threaded bars towards the ring and cut this to size. The ring can be positioned using the
bolts (M10) to ensure a horizontal connection between the supports.
When you are certain about the position, you can cut the coated tube to size and slide it over the threaded bars.
Only remove the support from the ridge profile when the roof has been entirely finished. If necessary, you can still
adjust the draw set by using the bolts in the ring.
Position both rose covers (8420) over the ring (8423). Use silicone for this.
8425
8424
8426
8424
8423
M10
8424
8426
M10
8420
8420
8423