20/11/2020
47/88
E_MH_Installation_instructions_Skylux_Climax
Gutter
GD2 + G + Y16P + C11CX
Assemble the gutter components to prepare for the installation of the gutter.
Ø 80
85
55
50/55
85
Ø
80
S1/S2
GD2
G
Y16P
Y16P
S1/S2
G
Y16P
PL165*
GD2
Y16P
102,5
70
235
68,4
156,2
C11CX
4
10
6
6
55
PU
3x ZSB
4
10
6
6
55
Cut out the opening for the water drainage.
Use a Ø 80 mm circular drill for this task.
Connect the gutter (G) to the gutter support (GD2)
using the Y16P. Install an additional Y16P in the bottom
slide detail. Slide in the hinge profile (S1 or S2).
Slide in reinforcement profile PL165* and/or PL105*
(optional).
Installation of U-bracket PU at the freestanding side.
Position the U-bracket 6 mm outwards in relation to
the gutter support.
Installation of seal C11CX.