20/11/2020
39/88
E_MH_Installation_instructions_Skylux_Climax
Finish
Installation of screw-in type side clips
Drill holes with a Ø of 5.5 mm in the CLSB every 500 mm, starting and ending at 200 mm from the ends.
Fasten the CLSB to the TPG using adapted Hi-Lo screws. Fasten perpendicularly and use a slight torque to ensure
the screw head is pressed flat against the CLSB. Either single screws and/or adaptor profiles CY10/Y25 must be
used depending on the glazing thickness (see the table on page 84).
Cut the CLL / CLSL profile obliquely on the wall side in accordance with the roof pitch a. Measure the distance
to the stop profile to determine the length of profile CLL/CLSL. Position profile CLL/ CLSL on the exterior
against the support profile and apply pressure manually using a rubber hammer and a plank. Fasten the CLL/CLSL
every metre sideways against the support (with ZSG) or against the wall using screws if the structure is to be
freestanding or against a wall.
500
200
α
1000
250
ZSG
ZSG
CLL/CLSL