Gutter GD2 + G + Y10
Assemble the gutter components to prepare for the installation of the gutter.
* The reinforcement profiles PL105 (100 x 5mm) are not supplied. This can be bought at any local hardware store.
We recommend treating the reinforcement profiles with an anti-corrosion product.
Connect the gutter (G) to the gutter support
(GD2) using the Y10.
Slide in thermal bridge Y16P in the lowest detail
of gutter support GD2. The length of Y16P
matches the distance between the posts or the
walls.
Slide in the hinge profile (S1 or S2).
Slide in reinforcement profile PL165*/PL105*
(optional).
Cut out the opening for the water outlet.
Use a Ø 80 mm circular drill for this task.
Installation of U-bracket UT 98
Installation of U-bracket PU
Ø 80
50 / 55
85
G
S1/S2
PL105*
Y10
G
PL165*
Y16P
GD2
2,5
2,5
50
4
4
55
UT98
ZSB (4x)
PU
ZSB (3x)