E_MH_Installation_instructions_Skylux_Climax
20/11/2020
16/88
Preparation
The Climax roof can be delivered cut-to-size to reduce the installation time.
The seals and certain other components are, when possible, fixed onto or into the profiles for the preinstalled roof
system.
Walls
Check that the walls, against which the structure is to be installed, are:
- Sufficiently load-bearing to anchor the roof.
- Free of obstacles such as water drains, window sills, etc.
Make a slot in the walls against which the conservatory roof is to be installed.
Install a lead slab or zinc flashing. We refer to page 10: Measuring your Climax pitched roof. Height = first joint
above HM + H and at most 60 mm above the wall profile.
For structures with a thermal bridge (for example, a closed veranda) we recommend making a slot in the walls
where the profile can be installed.
Floor
Ensure that the foundation can carry the load. Have an architect determine the required foundation. Implement
measures to remove rainwater from the roof.
Precautions
Protect the finished profiles against scratches and dents during installation.